Solutions
Catalog
All Business Areas
Technical Center - Thermohydraulic & Component Testing
T.00 Overall Thermohydraulic and Component Testing
T.01 Thermal hydraulic and mechanical testing for components (qualification, research, FAT,…)
T.02 Comprehensive valve testing (qualification, research, FAT,…)
T.03 Comprehensive pump testing (qualification, research, FAT,…)
T.04 Qualification test for Nuclear Components inside containment (LOCA, Climatic, Vibration) -- see also DTICQ
T.06 Testing of RPV internal at full scale for FAT or R&D subjects
T.07 Testing of Debris Retention System (also in integral loop) / sump sieve clogging, including insulation material fragmentation tests after LOCA
T.08 Comprehensive tests for Fuel Assemblies
T.09: PWR full scale system testing (PKL)
T.10 Passive safety system testing [INKA, PKL]
T.11 Vibration and Mechanical Tests: Separate fluid-dynamic and mechanical tests for nuclear power plants (e.g., on fuel elements, S/G tubes)
T.12 Thermal Hydraulic Characterization
T.13 Safety Valves Service and Hot Adjustments
T.15: Smart Weld (monitoring of welding machines)
T.16 Training (PKL, valve diagnostics, PDRV)
T.17 Test facility and Thermal hydraulic loops consultation, design, engineering, manufacturing and set-up
Cookie Settings
Technical Center - Thermohydraulic & Component Testing
DTI
1
2
/ 2
29 Products
Product name
Market Area(s)
Customer Benefit
A1565 :
APPEL - UPV – Framatome's Pump Test Loop: Qualification according to ISO 9906, accident operation conditions, fast thermal transients, particle loaded water
Framatome advantage
;
Plant in operation
;
New plant
A1403 :
ASME certified flow capacity tests for pressure relief devices
Framatome advantage
;
New plant
A1576 :
BENSON – High pressure thermal hydraulic separate effect tests
New plant
;
Framatome advantage
;
Plant in operation
A1559 :
DEREST Debris Retention System Test Facility - LOCA: Qualification with respect to pressure loss, chemical effects and downstream effects
Framatome advantage
;
Plant in operation
;
New plant
A1312 :
Engineering and design of test facilities: full scale test, thermal-hydraulic platforms, systems and equipment tests facilities …
Plant in operation
;
Framatome advantage
A1179 :
Equipment Qualification for Climate, Seismic and Vibration Loads
Framatome advantage
;
Plant in operation
;
Other sectors
;
Plant's long term operation
A1512 :
Fuel Assembly Component Testing: Design Validation and Life Time Assessment of FA Elements
New plant
;
Framatome advantage
A1561 :
JAVA Plus Test Facility for Qualifying filtered containment venting systems (FCVS)
Framatome advantage
;
Plant in operation
;
New plant
A1570 :
KADYSS Test Facility for Qualifying Pump Seal System simulates effects of station blackout on pump-shaft seal systems in nuclear power plants
Framatome advantage
;
New plant
A1571 :
KATHAR Test Facility for Qualifying Pressurizer Heaters: Long-term behavior under full pressure and temperature conditions with simulated service life
Framatome advantage
;
Plant in operation
;
Other sectors
;
New plant
;
Plant's long term operation
A1409 :
LOCA Qualification for SMR
Advanced reactors
A1598 :
PKL Integral Test Facility: Classroom Training on PWR Thermal-Hydraulic System Behavior - For PWR reactors
Framatome advantage
A1511 :
PWR Fuel Assembly Tests (PETER)
New plant
;
Framatome advantage
A1556 :
Qualification of Components: Integral Test Stand Karlstein (INKA)
Framatome advantage
;
New plant
A1775 :
RPV Internals Testing and Qualification
Framatome advantage
;
Plant in operation
;
New plant
A1398 :
Safety valves setting under nominal boundary conditions
Plant in operation
A1590 :
Similitude Tests: Optimization of components and processes - Fluid-dynamic and thermal-hydraulic tests validate and optimize design
Framatome advantage
;
Plant in operation
;
New plant
A1995 :
Smart Weld: monitoring of welding machines
Innovative solutions
;
Other sectors
;
Framatome advantage
A1557 :
Steam Generator Component Testing: Design Validation and Life Time Assessment - For PWR reactors
Framatome advantage
;
Plant in operation
;
New plant
;
Plant's long term operation
A1577 :
Test facility KOPRA – Multifunction component test and qualification facility (fuel assemblies, Control Rod Drive Mechanisms, valves)
Framatome advantage
;
Plant in operation
;
New plant
We have more services to offer you in this area. Please contact us for more information.
1
2
/ 2
This site uses cookies
By continuing your navigation, you accept the use of cookies. For more information, or to manage to change the cookies parameters on your computer, read our
Cookie policy
.
I accept the cookies
I refuse the cookies