Long term operation – Life time extension

A1088

The Preparatory Study for Long-term Operation assesses the feasibility of extending plant operating life. IAEA’s LTO feasibility requirements are the basis of Framatome’s Preparatory Lifetime Study. This simplified, rapid approach helps identify plant-wide preventive measures to enhance the current technical condition of the plant and recommend time frames for implementation. The assessment can also include a preliminary evaluation of key cost elements to support investment decisions. Framatome NP’s Preparatory LTO Study provides the utility with the road map to lifetime extension, license renewal or LTO.

Sub-products

A1093

Reliability Improvement

A1092

Plant Life Time Extension (PLEX) - Long Term Operation (LTO)

A1091

Safety analysis for plant life management: Periodic Safety Reviews

A1090

Plant Life Services: license Renewal Services (safety reviews) applicable to PWR and BWR

A1089

Large Component Disposal

Related solutions