Long term operation – Life time extension
A1088
The Preparatory Study for Long-term Operation assesses the feasibility of extending plant operating life. IAEA’s LTO feasibility requirements are the basis of Framatome’s Preparatory Lifetime Study. This simplified, rapid approach helps identify plant-wide preventive measures to enhance the current technical condition of the plant and recommend time frames for implementation. The assessment can also include a preliminary evaluation of key cost elements to support investment decisions. Framatome NP’s Preparatory LTO Study provides the utility with the road map to lifetime extension, license renewal or LTO.
Sub-products
A1093
Reliability Improvement
A1092
Plant Life Time Extension (PLEX) - Long Term Operation (LTO)
A1091
Safety analysis for plant life management: Periodic Safety Reviews
A1090
Plant Life Services: license Renewal Services (safety reviews) applicable to PWR and BWR
A1089
Large Component Disposal